In Dam Control System there are 4 Operations Processing, Data/Infromastion Provision, Control, and Data Collection. Dams management are built across rivers and waterways to control the flow of water, store water, and generate electricity
Labor Saving in System Operation and Management
With JRC’s modern tools and practices, labor-saving approaches in system operation and management enhance productivity, ensure safety, and enable better allocation of resources for sustainable and effective utilization of the system’s capabilities.
Optimum Management of Water Resources
JRC’s DAM Management ensures the equitable distribution of water, minimizes wastage, and promotes long-term water security and resilience for present and future generations. Optimal water resource management strives to achieve a delicate balance among competing demands, effectively tackle water scarcity and quality challenges, and adeptly adjust to evolving environmental conditions.
Safety and Security in Upstream and Downstreams Basins
Upstream safety involves assessing the structural integrity of dams and implementing monitoring systems to detect potential risks of dam failures or breaches. Upstream and downstream basins can better withstand natural disasters, maintain water flow stability, and ensure the wellbeing of the people and ecosystems relying on these water resources.
The Telemetry System is used for data transmission between remote locations. Telemetry mainly measures, collects, and transmits data, such as rainfall river, water levels, road meteorology, and so on.
JRC’s Telemetry System can be easily customized according to every customers’ needs.
Large Number of Data Samplings
Our telemetry system have large number of data samplings of 120 data/60 stations. With one telemetry system can handle various type of data such as rainfalls, water levels, weather, and water quality.
Short Data Collection Time of 40 Seconds
With the large number of data sampling, out telemetry system still can perform short data collection time of 40 seconds (about 1200 bps with 120 data/60 stations)
Simultanetly of Data
Because of the batch call, the data can collect from all the gauging station and reads in data at the same time.
Flexible Control
The optimeal system can be structured since one set of telemetry supervisory equipment can collect data in dual-quantity or multi-quantity combined from. Our telemetry system is an economical system that can be built because of applicability of a composite system.